Contacts
Address
Nigeria, Lagos , Ikeja, 2b, Lily Drive MKO Abiola Garden Alausa Ikeja
Phones of enterprise
management
+234
When placing an order please inform the manager that you've learned the information on Allbiz! Thank you that you buy on Allbiz!
Internet
Site:
About enterprise
Krypton Water - Wastewater Management, Limited
Construction, Installation and Maintenance of Sewage Treatment Plant.
Quality Equipment and Fast Delivery.
Custom order, 14 days | Wholesale and retail
Price:
97881330 NGN
Krypton Water/ Wastewater Management Limited, is a multidisciplinary engineering, consulting and trading company that provides innovative, proven, state of the art and sustainable technology solutions in water and wastewater sectors including design, engineering, supply, installation and...
Group: The equipment for sewage treatment
Custom order, 21 days | Wholesale and retail
Price:
4376127.2 NGN
Wholesale:
- 3838708.07 NGN/pcs - from 4 pcs
Innovative Submersible Pumps with Cutter System
HOMA GRP Series grinder pumps utilize an innovative, hardened cutter system to shred soft solids and stringy materials outside of the pump to prevent clogging. GRP Series pumps are ideally suited for residential, domestic, and municipal wastewater, as...
Group: Sewer pumps
In stock | Wholesale and retail
Price:
4076707.97 NGN
Drainage and sewage
Efficient solutions for a clean conscience
All buildings and households in the world produce sewage that must be reliably disposed of in order to meet hygiene standards and prevent noxious odours. However, in places where drainage and sewage doesn't simply flow into the sewer...
Group: Choppers waste
Price:
1250000 NGN
Maintenance
Our maintenance services includes:
Repair and rehabilitation or replacement of wastewater pipelines and assets
Manhole and manhole cover replacement
Emergency by-pass pumping
Blockage clearance
House Connection Branch installations and replacements
Pain
Group: Maintenance of dewatering
Price:
850000 NGN
Our maintenance services includes:
Repair and rehabilitation or replacement of wastewater pipelines and assets
Manhole and manhole cover replacement
Emergency by-pass pumping
Blockage clearance
House Connection Branch installations and replacements
Painting...
Group: Waste recycling services
Price:
6590000 NGN
In Extended Aeration System the biological process is Aerobic and the raw sewage after screening is first sent to the aeration tank for digestion of organic matter and its treatment. The treated effluent thereafter undergoes secondary treatment and is sent to the settling tanks which have Hopper...
Group: Reconstruction of water treatment systems
Price:
7890000 NGN
Over 80 percent of wastewater nationwide is not collected or treated. Water is perhaps the only natural resource to touch all facets of human civilization. Given the ubiquitous need for water in agriculture, industry and households, the aforementioned statistic presents a plethora of opportunities...
Group: Services of wastewater treatment
Price:
150000 NGN
Evacuation of excess activated sludge or waste from septic tank or soak-away and cleaning.
Group: Environmental management